develop and how many times the full CI runs.
Level decision tree
The three questions
1
Are you fixing a contained defect?
If the change corrects wrong behavior, touches a single project and is around 200 lines or
fewer, it is a Level 1 · Fix. If it is a production
incident, it is a hotfix from
master.2
Does it fit in a single PR with a single intent?
If the feature can be reviewed in one go (about 800 lines and 40 files as a reference)
and does not mix goals, it is a
Level 2 · Scoped development.
3
Is it weeks of work, or does it change something users can see?
If the answer is yes (a new module, schema migrations or a behavior change that must be turned
on in a controlled way), it is a
Level 4 · Module initiative. Otherwise,
it is a Level 3 · Multi-PR feature.
Quick comparison
Signs you picked the wrong level
My Level 2 is already past 800 lines
My Level 2 is already past 800 lines
Turn it into a Level 3: create the integration branch from
develop, retarget your current PR
to that branch as the first sub-PR and continue from there. Do not keep adding commits to a PR
nobody can review in one go.My fix needs a migration
My fix needs a migration
If the migration is additive and small, it is still a Level 1 or 2. If it changes existing data
or breaks compatibility, apply the Level 4 expand/contract pattern.
My Level 3 has been running for more than two weeks
My Level 3 has been running for more than two weeks
It is probably a Level 4. Add a feature flag and merge what is already done into
develop as a
first phase.