What a workflow holds
A representative comes from the catalogue
signature_enterprise_signer. Each
one has a display name, a credential reference for its signing certificate,
a reference to the proof that it represents the company and, for unattended
signing, a reference to its recorded consent.
The seeded defaults (home, horeca and business) use
company_phase = last
and a count quorum of one representative; the admin API can change them.
Resolution and snapshot
- Pick the workflow. The workflow assigned to the contract wins; otherwise the active default of its business unit. With neither, the group cannot open.
- Keep usable representatives. Inactive representatives, or those whose validity has ended, are skipped. An unattended seat without its consent reference stops the group from opening, and so does a workflow with no usable representative left.
- Apply the quorum. With
count, the first N required seats by signing order are used. The group cannot open if the workflow has fewer. Withall, every required seat is used, or every seat when none is required. - Freeze it. The resolved workflow, with its seats, is stored on the
group as
workflow_snapshot. Changes to the workflow itself do not alter a group that is already open. The representatives are a different matter: when an unattended seat signs, the engine checks the representative’s current status, validity and credential, and sealing uses its current credential. A representative revoked while a group is open stops that group’s unattended signature while that seat is still pending.
Phase order
The phase gate decides which side may act now.
When both sides are complete, the engine seals the PDFs.
A consumer can hold the company phase back. Digital contracting parks a
last group until Maihue operations approve the contract, and only then
starts the unattended company signature. See
Digital contracting — Signing.Admin API
Replacing a representative is a revoke plus a new representative added to
the workflow. New groups pick up the new one; an open group whose unattended seat for the
revoked one is still pending cannot complete its signature.
Code
Paths are relative to
backend/horizon-api/.